Welcome Guest: Register on Agbazilo / LOGIN! / Leaderboard / Refer and Earn / Recent / New/ Payouts

Stats: 6,754 members, 12,472 topics.

NigeriaLagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon

Agbazilo Platform / Political Affairs (2 Views)

    (Go Down)
(1)
https://www.youtube.com/watch?v=vPX3MkvxmMM?si=PdprynJIvKZgkNXL


https://www.youtube.com/watch?v=c_1iuPBFSfk?si=O6-bSEANjf8CvFtm


Right now, a massive 8.1km stretch of 1600mm Diameter Ductile Iron (DI) pipes is being laid within the Adiyan premises. These pipes will transport raw water into a cutting-edge 320,000m³/day water treatment plant, ensuring that every drop meets World Health Organization (WHO) standards.

Lagos is on a mission, and the Adiyan Water Works I & II is at the center of it all. We will ensure that clean, pipe-borne water flow seamlessly into homes, schools, and businesses—every single day. That’s the vision, and trust us, the @jidesanwoolu led administration is making it happen.

It’s not just government officials who are excited about this! One of Nigeria’s most authentic storytellers on two wheels, the incredible vlogger, Authentic Cyclist @edward_wonder also made a stop at Adiyan Water Works to authenticate our excitement. With his signature blend of adventure and urban storytelling, he captured the sheer scale of this engineering feat—cycling through the vast premises, showcasing the intricate pipe-laying process, and bringing the project to life for his audience.

This is the future of Lagos!
#ThisIsLagos

@followlasg
https://x.com/tokunbo_wahab/status/1898453525811655081?t=84a1_UQjFJHX2rCWjymt1A&s=19
1 1
Nice one 👍
1 1
Lagos: 80-million Gallons Per Day Adiyan Water Works To Be Finished Soon1
(1)

Oops! Must be Logged in to REPLY

LOGIN or Create an Account
(Go Up)

Agbazilo © 2025 All rights reserved.

Rules and Regulations, Privacy Policy, Terms and Conditions Email At: Send Email Disclaimer: Every Agbazilo member is solely responsible for anything that he/she posts or uploads on Agbazilo.